PROGRAMME s.a.r.l.

Programmation en architecture & aménagement

Presentation
References

-------------------------------

65, rue Alexandre Dumas - 75020 Paris
Mobile : +33(0)6 08 17 66 97
Email : yves@programme.fr
Google map

Fr  En

---------------------------

• Higher education
• Social facilities
• Retailspaces
• Industrial sector
• Media
• Libraries/resource centers
• Museums/exhibitions
• Urbanism & landscaping
• Theatres & halls
• Headquarters/offices
• Miscellaneous
Download

-----------------------------

• Verdun memorial museum
• Exhibition space for contemporary art Agnès b, Paris (la Fab.)
• Emergence of St Denis-Pleyel station
• Museum and reception space for visitors to the Montblanc factory, Hambourg
• Electropolis museum, Mulhouse
• Museum of Built Environment, Riyadh,
Saudi Arabia

• Fondation Cartier
• Belgian pavillion
Shanghai 2010

• Pavillion of France
Shanghai 2010

• Pavillion of France
Zaragoza 2008

• VVC park, Moscou
• Science museum,
Thiron-Gardais

• Centre for creation
in modern art, Dreux

• Farming museum
• François Pinault found.
• Archeology park, Alésia
• Sémimages, Seine-St-Denis
• Vacheron Constantin historic museum, Genève
• Science museum, Frameries
• Exhibition halls for
the presentation of urban
and architectural heritage

• Rivierre-Casalis site, Orléans
• Hermès exhibition
• Exhibition halls for
the presentation of urban
and architectural heritage

• Energy, town and agriculture modules
• C.C.S.T.I., Chambéry
• C.I.P.P. Eurotunnel

FRANCOIS PINAULT FOUNDATION FOR CONTEMPORARY ART


LUBA, société du groupe François Pinault
Marc Desportes 01 44 11 62 20
Architect : Tadao Ando Architects and partners and Setec Ingénierie

------------------------------------------------

François Pinault foundation

------------------------------------------------

2002/2004

------------------------------------------------

General programming of a private modern art museum, on the Isle Seguin, former site of Renault production factory. The architectural competition was won by Tadao Ando.
Assistance to the Client for verification that design was in compliance with program during Preliminary Design and Design Development stages up to the choice of contractors. Detailed technical programming (functional and technical features room per room for all activities).
The whole building was about 30.000 sq.m GFA.
The project has not been built.